PROFESSIONAL EXPERIENCE — 2019-2026
2019–2020 — FAMILY HOUSE
Saint-Jean-Cap-Ferrat, France
Scope
– renovation of a family house.
Status
Completed.
• 2021 — MS SOSA APARTMENT
Argentina
Scope
– complete apartment renovation.
Status
Completed.
• 2022 — VILLIERS-SAINT-BENOÎT
Burgundy, France
Rural house.
Scope
– renovation and transformation design for an existing house.
• 2022 — PARIS
France
Pre-acquisition study for a property.
Scope
– assessment;
– technical analysis;
– economic analysis;
– feasibility study.
Status
Study completed. Acquisition not pursued.
• 2022–2026 — ARNDT & PARTNER ING.-BÜRO
Berlin, Germany
Professional activity
– renovation and transformation of existing buildings;
– assessment and measured surveys of existing conditions;
– design and development of technical solutions;
– architectural and technical documentation;
– interior and exterior refurbishment;
– roof renovation and conversion;
– coordination of trades and contractors;
– technical and organisational site supervision;
– documentation and control related to fire protection.
Works and projects
• Acid Mitte — Rosenthaler Strasse 9, City Centre
Site supervision and adaptation of the drawings developed by the Spanish architectural practice.
• Birkbuschstr. 57 / Sedanstr. 25
Full measured survey and preliminary design for roof conversion.
• Böhmische strasse 16a
Site supervision.
• Brandenburgische strasse 32
Full measured survey and preliminary design.
• Buchenstr. 52
Site supervision for the complete replacement of the roof.
• Friedrichshaller str. 30
Interior design and site supervision.
• General-woyna-strasse 46/47
Fire protection design.
• Grunewaldstrasse 87
Analysis and development of timber beams for the floor structures.
• Holsteinische fassaden
Development of the façade refurbishment.
• Krossener strasse 8
Full measured survey and design.
• Libauerstrasse 10
Full measured survey, analysis of existing conditions and preliminary design.
• Lietzenburger str. 12
Interior design and site supervision.
• Machnower strasse 39 a
Façade refurbishment and site supervision.
• Markgrafendamm 18
Fire protection design.
• Marschnerstr. 28
Façade refurbishment and site supervision.
• Menzelstrasse 8
Full measured survey and roof conversion design. Subsequently, development of two independent interior architecture projects: one on the ground floor and one on the 2nd floor.
• Menzelstrasse 9
Full measured survey and roof conversion design. Subsequently, development of an interior architecture project for a 4th-floor apartment.
• Mittenwalder brandschutz
Completion of the fire protection design.
• Mittenwalder str. 51
Full measured survey and adaptation of the interior design associated with the roof conversion.
• Orber strasse 18
Measured survey and complete design for the conversion of the space beneath the existing roof.
• Rapstedter weg 55, berlin-west
Roof conversion design and adaptation of the existing interiors.
• Schildhornstr. 95
Interior design and site supervision.
• Sybelstr. / Dahlmannstr.
Interior design and site inspection.
• Voigtstrasse 7/8
Measured survey and interior design.
• 2025 — PARIS 13TH ARRONDISSEMENT APARTMENT
Paris, France
Scope
– complete apartment renovation.
Status
Completed.
• 2026 — MR FERNÁNDEZ APARTMENT
Autonomous City of Buenos Aires, Argentina
Scope
– complete apartment renovation design.
PROFESSIONAL EXPERIENCE — 2009-2019
• 2008–2015 — COLLABORATION WITH DAMONTE–DONALDSON ARQUITECTOS
General scope: construction supervision.
Projects
– 2008–2009 — CAÑUELAS GOLF — CLUB HOUSE
2,600 m².
Construction supervision.
– 2009–2013 — ÁREA 60 GOLF — CLUB HOUSE
Brandsen, Buenos Aires — 1,800 m².
Construction supervision.
– 2011–2012 — OKITA HOUSE
Barrio Cerrado Pingüinos — 1,700 m².
Construction supervision.
– 2011–2013 — SCHWARTZ HOUSE
San Isidro, Buenos Aires — 3,000 m².
Construction supervision.
– 2013–2015 — STUART HOUSE
San Isidro, Buenos Aires — 2,700 m².
Construction supervision.
• 2010 — SCHETTINI CONDOMINIUM
Six single-family houses.
Owner: Schettini family.
Construction-stage responsibility: Cedric Marinot / Gonzalo Valenzuela.
Scope
– construction administration;
– construction management;
– construction supervision;
– overall coordination between the client, design firms and contractors;
– coordination of the different design firms during construction;
– overall organization and construction follow-up;
– selection and appointment of contractors;
– analysis and comparison of financial proposals;
– coordination and administration of payments.
Organization: Client → Cedric Marinot / Gonzalo Valenzuela → design firms and contractors.
Note: the involvement began once the architectural designs had been completed. There was no participation in the selection of the design firms or in the design stage.
Design by unit
– UF 1 — Design: Estudio Oliver Busto.
– UF 2 — Design: Gabriel Tropea.
– UF 3 — Design: Estudio Billoch & Asociados / Juan Carosi.
– UF 4 — Design: Martín Zanotti.
– UF 5 — Design: M. Nogaro G. / Federico Barbero.
– UF 6 — Design: Estudio Billoch & Asociados / Juan Carosi.
• 2010–2011 — HEINRICH HOUSE — REVIEW / UPDATE
Los Galápagos — Original project: 1997.
Scope: review and subsequent update of the project.
Status: completed.
• 2011 — SAN FRANCISCO — MALDONADO
Maldonado, Uruguay
Feasibility study and preliminary design for a residential condominium development.
Program
– two floors;
– semi-basement;
– parking;
– small rental units;
– balconies;
– shared garden;
– barbecue area.
Scope
– site analysis;
– regulatory analysis;
– architectural scheme;
– technical report;
– financial analysis;
– costs;
– sales assumptions.
Status: preliminary design / investment study. Not built.
• 2012 — ALLIANCE FRANÇAISE DE BUENOS AIRES
Architectural competition.
Scope: design for the comprehensive renovation and refurbishment of the existing building.
Result: second prize.
• 2012 — QUINTANA 535
Buenos Aires — Duplex.
Scope: comprehensive renovation and interior architecture of a two-level residence.
Includes
– general floor plans;
– kitchen;
– bathrooms;
– laundry room;
– staircase;
– countertops;
– mouldings;
– furniture;
– custom details.
Status: completed.
• 2012 — EINHELL
Retail space / showroom.
Scope
– interior design;
– organization of display areas;
– circulation layout;
– garden section;
– platforms;
– display units;
– retail furniture.
Status: completed.
• 2012 — GENEVA LAB
Retail space / showroom.
Scope
– interior design;
– spatial organization;
– glazed storefront;
– custom furniture;
– audio product display system.
Status: project not built.
• 2013 — VARGAS HOUSE
Urban house between party walls, developed over several levels.
Scope
– architectural design;
– construction supervision.
Status: completed.
• 2013 — CASTANIER HOUSE
Pilar del Este, Pilar, Buenos Aires — Single-family house, 174.5 m².
Construction system: Steel Framing.
Scope
– architectural design;
– construction documentation;
– detail development;
– construction.
Status: completed.
• 2014 — ESTANCIA LA CORONA
Carlos Casares / 9 de Julio area, Province of Buenos Aires
Historic main house dating from 1886 — 1,000 m².
Scope
– comprehensive restoration;
– design;
– construction supervision;
– coordination;
– completion of all construction works.
Includes
– interiors;
– kitchen;
– joinery;
– ironmongery;
– fireplaces;
– lighting;
– equipment;
– finishes;
– restoration of original elements.
Status: completed.
• 2014 — LANÚS HOUSE — GENERAL MADARIAGA
General Madariaga, Buenos Aires — Single-family house.
Area: 119.91 m².
Site: 895.50 m².
Scope
– architectural design;
– documentation;
– construction supervision.
Status: completed.
Note: the municipal filing signed by another architect was solely due to an administrative issue related to jurisdiction and professional registration and does not alter the actual authorship of the work.
• 2015–2016 — YPF ADMINISTRATIVE BUILDING
Las Heras, Santa Cruz — 1,000 m².
Architectural design: Arch. E. Xaus.
Scope
– technical coordination;
– supervision of the works;
– construction follow-up.
Contractual arrangement: indirect contract.
Status: completed.
Note: the scope did not include authorship of the architectural design or conception of the building.
• 2017–2018 — BUENOS AIRES–CAÑUELAS HIGHWAY — STAGE 1
Client: AEC Sociedad Anónima — Autopistas al Sur.
Program: building projects associated with the highway.
Scope
– project analysis;
– documentation;
– drawings and technical documentation.
Status: project completed. Not built.
• JANUARY 2018–JULY 2018 — BUENOS AIRES–CAÑUELAS HIGHWAY — STAGE 2
Client: Corredores Viales S.A.
Program: building projects associated with the highway.
Scope
– project analysis;
– documentation;
– preparation of drawings.
Status: project completed. Not built.
• 2018 — PALACIO DUHAU
Buenos Aires
Client / firm: Leguizamón Ezcurra.
Scope
– monitoring of construction works;
– progress follow-up;
– preparation of reports.
Status: completed.
• 2018 — ARGENTINE NATIONAL CONGRESS — CHAMBER OF DEPUTIES
Buenos Aires — Deputies sector.
Scope: construction supervision and control.
Status: completed.
• 2018–2019 — JACQUES BEDEL AND FLORENCE BARANGER RESIDENCE
Buenos Aires
Firm: Marinot–Skamelka.
Duration: six months.
Area involved
– ground floor + first floor + second floor + terrace: 387 m² x 4 = 1,548 m²;
– added rear section: 150 m².
Rear section: height equivalent to four levels, without intermediate floor slabs.
Total area involved: 1,698 m².
Scope
– comprehensive renovation;
– overall coordination;
– execution and construction follow-up;
– restoration and adaptation of existing elements;
– coordination of finishes and building services.
Status: completed.
Reference: D&D — “La recompensa del que espera”.
https://dyd.com.ar/la-recompensa-del-que-espera/
• JULY 2018–2020 — BUENOS AIRES–CAÑUELAS HIGHWAY — STAGE 3
Client: Corredor Vial Sur.
Consortium: Rovella Carranza / JCR S.A. / Mota-Engil.
Program: building projects associated with the highway.
Scope
– project analysis;
– documentation;
– drawings and technical documentation.
Status: project completed. Not built.
Note: the project formed part of the Public-Private Partnership (PPP) system. On 23/12/2020, the Argentine National Government formally terminated the PPP contracts for the road corridors through Decree 1036/2020.
PROFESSIONAL EXPERIENCE — 1999–2009
• 1999–2001 — PUNTA CHICA I CONDOMINIUM
Beccar / Punta Chica, San Isidro — 31 residential units, 5,700 m²
Scope: architectural design, construction documentation, construction supervision and construction management.
Status: completed. Published in Clarín, 30 June 2001.
• 2001 — ROSSI HOUSE
Azcuénaga / San Andrés de Giles, Buenos Aires — Country house, currently known as “El Cielito”
Scope: complete architectural design, construction documentation, technical specifications, self-sufficient energy system design, construction supervision and management, contractor coordination, procurement and overall construction follow-up.
Status: completed.
• 2001–2002 — R. LANUS HOUSE
Talar del Lago, Buenos Aires — Single-family house, 751 m² site, 310 m² built area
Scope: architectural design and construction supervision.
• 2002–2009 — RAHOLA CONSTRUCCIONES — PATAGONIA
Independent professional practice involving fish-processing plants and industrial facilities.
General scope: design, construction documentation, site inspection and construction supervision.
Projects
– 2002–2009 — ARBUMASA S.A.
Port of Comodoro Rivadavia, Chubut
Architects: Miguel A. Rahola / Cedric Marinot.
Scope: design and successive extensions and adaptations of an industrial fish-processing plant, including processing areas, cold and fresh-storage rooms, freezing, packaging, changing rooms, sanitary filter, administration and offices, plant room, workshops, effluent treatment, paving, utility networks, tanks, pumping systems, loading areas and parking.
Status: works completed over several years.
Note: in mid-2009 Arbumasa permanently closed its Comodoro Rivadavia plant.
– ARBUMASA S.A. — PUERTO DESEADO
Fish-processing plant, office extension and miscellaneous works.
– PESCASUR
Fish-processing plant, changing rooms, sanitary facilities and storage areas.
Status: not built.
– PESQUERA SANTA CRUZ
Fish-processing plant design.
Status: not built.
– ARGENOVA
Puerto Deseado / Comodoro Rivadavia
Scope: processing-plant studies, alterations, service areas, paving, cost estimates and technical development.
Status: projects not built.
– CONARPESA
Design and cost estimate for the extension of changing rooms, offices, sanitary facilities and cold-room access areas.
Status: not built.
– CENTOMAR
Fish-processing plant project.
Status: not built.
– 2008–2009 — MONTIEL PROJECT
Scope: design, construction supervision and technical representation for truck-washing facilities.
Status: completed.
• 2004 — GÜERAIKE RESTAURANT
Caleta Olivia, Santa Cruz
Scope: site inspection and construction supervision.
Status: completed.
• 2004 — FRESH AIR FREE NETWORKS — SUMMER CONVENTION
Djursland, Denmark — September 2004
Participation with Santiago Clotta.
Scope: training in community wireless networks and presentation of the project developed for implementation in Argentine Patagonia.
• 2004–2005 — INTERNET SANTA CRUZ
Provincial Internet Integration Plan — Province of Santa Cruz
Project leads: Santiago Clotta / Cedric Marinot.
Territorial, technological and digital-infrastructure project.
Scope: universal Internet access for public institutions, schools, libraries, universities, associations, professionals, businesses and households; reduction of the digital divide; digital public services; e-government; and telecommunications infrastructure.
Infrastructure studied: fibre or satellite backbone, wireless networks, last-mile connections, 2.4 / 5 GHz technologies, routing, DHCP, NAT, PoE and network management.
Status: project developed. Full implementation not documented.
• 2005 — LOS ROBLES HOUSE — E. JOSEPH
Maschwitz / Escobar, Buenos Aires — Single-family house with swimming pool
Site 1,173.22 m² — Built area 227.14 m² — Pool 36 m²
Scope: architectural design and construction supervision.
Status: completed.
• 2007 — SCHANT HOUSE
Rada Tilly, Chubut — Single-family house
Site 600 m² — Built area 180 m²
Scope: architectural design.
Status: final design, not built.
• 2007 — R. LANUS HOUSE
Talar del Lago, Buenos Aires
Scope: exterior design for an existing house, including terraces, pergolas, swimming pool, deck and landscape treatment.
• 2007–2008 — AYESTARÁN
Transporte Chiriguano 707, Rada Tilly, Chubut — Three single-family houses + pavilion, 380 m²
Client: Luis Ceferino Ayestarán.
Scope: architectural design, construction supervision and technical representation.
Construction: managed on an administration basis; physical execution carried out by third parties.
Status: completed.
• 2008 — CASA DE PIEDRA
La Pampa — Residence associated with the Ministry of Mining of the Province of La Pampa
Clients listed: GNN Werthein SAAGEI / Petrosiel S.A. / Energial S.A. / UTE.
Scope: architectural design, construction supervision and technical representation.
Note: project developed under the specific architectural guidelines applicable to the area.
Status: completed.
PROFESSIONAL EXPERIENCE — 1991–1999
• 1991–1995 — CLUB NÁUTICO SAN ISIDRO
San Isidro, Buenos Aires
Consulting Architect — Head of Works
Responsibilities
– preparation of architectural and construction documentation;
– construction supervision;
– participation in project studies and design development;
– new-build works, refurbishments and extensions;
– maintenance of buildings and facilities;
– preparation of tender documents and technical specifications;
– review of cost estimates and contractor quotations;
– coordination and supervision of contractors;
– supervision of contracted personnel;
– coordination with specialist consultants;
– monitoring of structural repair works;
– liaison and procedures with public authorities and private entities.
Principal works
ADMINISTRATION AND MAINTENANCE BUILDING
– new administration building;
– extensions and alterations to maintenance areas, workshops and service facilities.
MAIN BUILDING
Major comprehensive refurbishment.
– complete refurbishment of the exterior and façades;
– works to foundations and the existing structure;
– restoration and repair of deteriorated building elements;
– renewal and upgrading of building services;
– refurbishment of changing rooms;
– refurbishment of squash courts;
– works to basement and service areas.
BAHÍA BINCAZ RESTAURANT
– refurbishment and extension of the restaurant;
– refurbishment of kitchen and bar;
– upgrading of interior and service areas.
MARINA FACILITIES
– construction of marina facilities;
– associated infrastructure works.
TRAVEL LIFT
– design;
– technical documentation for siting and installation.
MAINTENANCE, REPAIR AND UPGRADING WORKS
– swimming pools and changing rooms;
– workshops and ancillary buildings;
– office extensions;
– water distribution networks;
– plumbing and sanitary services;
– services and lighting for tennis courts;
– structural repairs;
– general maintenance of buildings and facilities;
– numerous minor refurbishment, repair and upgrading works throughout the Club.
• 1991 — HOGG HOUSE
Punta Chica, Buenos Aires — Single-family house
Scope: renovation design.
• 1991 — INTERAMERICANA COMPAÑÍA DE SEGUROS
Buenos Aires — Offices, 680 m²
Scope: office renovation design.
• 1991 — PUERTO MADERO CULTURAL CENTRE
Buenos Aires
Scope: architectural design.
• 1992 — BAUER ARGENTINA S.A.
FEMATEC
Scope: exhibition stand design.
• 1992 — LAVANDA DE LAS SIERRAS
French Pavilion — La Rural, Buenos Aires
Scope: exhibition stand design.
• 1993–1996 — BANCO SUPERVIELLE — SOCIÉTÉ GÉNÉRALE
Services: property assessments and real-estate valuations.
• 1995 — DELACRETAZ HOUSE
La Reja, Province of Buenos Aires — Single-family house, 140 m²
Scope: architectural design; construction supervision.
• 1995 — ETERNIT COMPETITION
Tigre Delta, Province of Buenos Aires — Single-family house
Scope: architectural competition entry.
• 1996 — B&M HOUSE
Martínez, Province of Buenos Aires — Single-family house, 250 m²
Scope: architectural design; construction management.
• 1996 — M. HEINRICH OFFICES
Offices, 180 m²
Scope: architectural design.
• 1996 — M. HEINRICH HOUSE
Single-family house, 315 m²
Scope: architectural design.
• 1996 — OTHER WORK
– preliminary studies and feasibility assessments based on available construction budgets;
– preparation of CAD architectural documentation for a building contractor.
• 1997 — PHILIP AND MARIA HEINRICH HOUSE
Los Galápagos — Single-family house, 130 m²
Scope: architectural design; construction supervision.
Note: built under a bank-financed construction loan and subject to lender oversight.
• 1997 — CLUB NÁUTICO SAN ISIDRO — GYMNASIUM
San Isidro, Buenos Aires — 400 m²
Scope: architectural design.
• 1997 — B&M HOUSE
Los Cardales, Province of Buenos Aires — Single-family house, 160 m²
Scope: architectural design.
• 1997 — J. SERRA HOUSE
Maschwitz Privado, Province of Buenos Aires — Single-family house, 130 m²
Scope: architectural design.
• 1998 — ARTIFICIAL LAKE
Sierra de la Ventana, Province of Buenos Aires — F. Larivière
Scope: design.
• 1998 — ECOFISA
High-rise building, 14,000 m²
Scope: design assistance.
• 1998 — PLANET HOLLYWOOD / DIVINO BUENOS AIRES
Puerto Madero, Buenos Aires — International restaurant and entertainment project
Scope
– adaptation and compliance review of technical documentation in accordance with Argentine codes and regulations;
– coordination and compatibility review of building services;
– adaptation of materials, construction systems and finishes to local availability;
– interpretation and coordination of drawings and specifications received from overseas;
– preparation and coordination of cost estimates;
– review of electrical, plumbing, HVAC and fire-protection requirements;
– review of commercial licensing and permitting requirements.
Status: project fully developed and costed. Not built.
• 1998 — ESTANCIA LA MEDIA LUNA
Summer residence for Mrs. Mösser, 200 m²
Scope: design; execution of renovation works.
• 1998 — J. HEINRICH HOUSE
Los Galápagos — Single-family house, 150 m²
Scope: architectural design.
Status: not built.
• 1999 — H. HEINRICH HOUSE
San Isidro, Province of Buenos Aires — Single-family house, 300 m²
Scope: execution of comprehensive renovation works.
Design: P&M Marinot.
• 1999 — E. HEINRICH HOUSE
La Cañada Polo Club — Open Door, Province of Buenos Aires
Single-family house — Site area, 0.5 ha
Scope: construction supervision.
Design: P&M Marinot.
• 1999 — E. ADROGUÉ APARTMENT
Buenos Aires — 70 m²
INTERIOR ARCHITECTURE
Scope: design; execution of renovation works.
OTHER PROFESSIONAL EXPERIENCE — 1991–1999
• MAYFAIR INSTITUTE
Refurbishment and extension of the existing building.
• ESTANCIA LA RAQUEL
Km 168, Route 2 and Río Salado — Estación Guerrero, Province of Buenos Aires
Historic estancia main house of heritage value.
Scope: refurbishment and adaptation for tourism use; architectural consultancy.
• HOTEL EL ÁLAMO
Punta del Este, Uruguay
Five-star relais-style hotel project.
• FILIBERTO BIBILOI
Punta del Este, Uruguay
Aparthotel and conversion of an existing residence into apartments.
• HILTON HOTEL SITING STUDY
Buenos Aires
Scope: siting study.
• DORMY AEROCLUB
General Rodríguez, Province of Buenos Aires
Residential complex.
• ESTABLECIMIENTO LA PICAZA
Luján, Province of Buenos Aires.
• NAZAR & COMPAÑÍA APARTMENT BUILDING
San Isidro, Province of Buenos Aires.
• VALENTINETTI HOUSE
Martínez, Province of Buenos Aires.
• P. BEHIER — MONTEBELLO
Laguna del Sauce, Uruguay — Provençal-style villa and country estate
Programme: main residence; caretaker's house.
Floor area: 1,080 m².
• MULTI-UNIT RESIDENTIAL BUILDINGS
– Av. Balbín and Blanco Encalada — 6,000 m²;
– Palpa and Amenábar — 2,500 m²;
– 11 de Septiembre — 4,200 m².
• HOR S.A.
Feasibility study for the conversion of an existing structure into apartments.
• BAUER ARGENTINA
Retail premises; offices.
• SUDAMETAL S.A.
L. N. Alem and Tucumán, Buenos Aires — Offices, 480 m².
• DAGSA
320 m²
Scope: installation and consultancy.
• KYANG
Retail premises, 150 m².
• PISADAL S.R.L.
Multiple projects, 1,700 m².
• MAXINTA
Sarmiento and Florida, Buenos Aires — Offices, 250 m².
CONSULTANCY ASSIGNMENTS
– Moro Construcciones;
– SCI S.A. — Carlos Pellegrini 1165, 8th and 9th floors;
– Cura y Chjfec — Pte. Perón 1730, 5th floor;
– Campisi S.R.L. — Capilla del Señor.